Tile work along the CR-210 and Race Track Road corridors
St. Johns is two housing stocks sharing one name. In Julington Creek Plantation and the older neighborhoods off Race Track Road, houses from the 1990s and 2000s carry original tile that is worn, cracked or simply dated. In RiverTown, Shearwater, Beachwalk, Aberdeen and Durbin Crossing, the homes are new — and the tile work is owners upgrading the builder finish: a real tile backsplash instead of the 4-inch strip, a primary shower re-tiled the way they wanted it from the start, porcelain where the builder put sheet vinyl. We work both stocks, and the quote is written after a measure because the prep is different in each.
What we set in St. Johns
- Porcelain and ceramic floor tile, including large-format layouts
- Shower floors, walls and curbs when the shower is part of the agreed scope
- Kitchen backsplashes run to the cabinets
- Laundry-room and mudroom floors that take daily traffic and water
- Removal of the existing tile or flooring and surface prep when the job needs it first
Finished work from our jobs is on the projects page. Tile is quoted per job — there is no tile package price; the published $4.99/sq ft on this site is the LVP package in St. Johns.
Original tile in the older neighborhoods
In a 25-year-old Julington Creek bathroom, the question is what is under the tile: thinset that has let go in patches, a shower surround built before modern waterproofing membranes were standard, and grout lines that telegraph every crack in the setting bed. At the measure we check the substrate and say what has to be corrected before new tile goes on — that prep is written into the quote rather than discovered mid-job.
Upgrading the builder finish in the new subdivisions
In RiverTown, Shearwater and Beachwalk the floors are sound and the slabs are flat — the work is finish quality, not repair. Large-format porcelain through the main floor, a backsplash chosen by the owner instead of the design center, and a primary shower done with the tile the builder priced as an upgrade. New-construction access is easy and measures are quick to schedule along the CR-210 corridor.
Family schedules and work hours
St. Johns runs on school calendars — the measure and the work days are scheduled around them, and the written quote lists the days we are in the house and the day each room returns to service. Some communities set contractor hours; tell us your neighborhood when you book and we plan inside them. The general tile scope is on the Jacksonville tile page, and coverage is listed on service areas.
Call (904) 520-1994